WH factory inspection, is an important part of WH (ETL) certificate. Customers who apply for ETL/WH certificate for the first time can only get the certificate after passing the factory inspection.
Since the establishment of our company, we have conducted in-depth factory inspections to understand the problems and puzzles faced by factories at all levels. With our professional and rich experience, we have assisted the factory to perfect the construction of a strong quality system, prepare materials, and pass the audit of Intertek factory inspectors.
Part of the information required for factory inspection:
1. Prepare ETL test Report (CDR or Listing Report).
2. Prepare at least one ETL certified product
3. Prepare relevant certificates of parts and components.
4. Quality control manual
5. Procurement and inspection of raw materials and parts
Production quality control documents
7. Inspection records
Before Intertek issues an ETL certificate (ATM), the factory cannot ship products with ETL nameplates, and U.S. customs will detain products whose shipment date is earlier than the date of issuance.